Drill Pipe Riser Installation Workover Control System
Project Description: Drill Pipe Riser Installation Workover Control System
Project Overview: Combination of skid packages for the control ofDrill Pipe Riser IWOCS System
Specs:
- (1) Purged Control Cabin
- (1) HPU & Open Sea Control Unit
- Design Pressure: 5,000 psi & 10,000 psi circuits
- (49) Function outlets
- (1) Tubing Hanger Control Unit
- Design Pressure: 5,000 psi & 10,000 psi circuits
- (24) Function outlets
- (1) Remote Client Station (HMI) and (1) Client Station at each Control Unit/Room
- (1) Remote ESD Station
Key Design Features:
- Proprietary actuated control valve for remote operation to all three positions of valve
- Separate pumps, accumulators, & controls for each circuit with redundant filtration
- Umbilical interconnect for Open Sea and Tubing Hanger via multi-quick connect (MQC) stations and quick connect fittings
- Electrical in-line receptacles for skid power and communication interface between skids
- Intrinsically safe protection and indirect entry enclosure design for all instrumentation, providing ease of maintenance and troubleshooting in the field
- Redundant processors and communication throughout control system
- Lifting frame certified to DNV 2.7-1
- IECEx Zone 1 IIB T3 Area Classification
Project Applicable Standards:
- API 17F
- API 17G
- ASME Boiler & Pressure Vessel Code (BPVC)
- DNV 2.7-1
- DNV 2.7-2
- IEC 60079
- IEC 61892